Magnox

John on January 20th, 2012

Jacobs Engineering Group announced today that it signed a resource protocol for the recruitment of employees from Magnox Limited to Jacobs’ United Kingdom operations.

Continue reading about Jacobs Signs Resource Protocol With Magnox

admin on December 21st, 2011

A protocol for the transfer of employees from Magnox Limited to AMEC has been agreed by the two companies.

Continue reading about AMEC and Magnox Sign Transfer Protocol

admin on December 20th, 2011

Wylfa Site has reached a significant milestone in its lifecycle by taking delivery of the last Magnox nuclear fuel elements ever to be manufactured.

Continue reading about Final Fuel Elements Arrive at Wylfa

John on November 30th, 2011

Hertel has won a five-year framework contract as part of the Celadon Alliance for deplanting, demolition and asbestos (DD&A) removal across 10 Magnox power station sites.

Continue reading about Major Nuclear Decommissioning Win for Hertel in the UK

John on November 4th, 2011

Costain has been awarded a £2million contract to demolish an offshore steel sheet pile barrier wall for client Magnox, at Bradwell, in Essex. 

Continue reading about Contract to Remove Bradwell Barrier

John on October 24th, 2011

Following workforce briefings on Friday, Magnox Ltd are today announcing that the remaining operating reactor at Oldbury will cease generation in February.

Continue reading about Oldbury to End Generation in 2012

John on September 28th, 2011

Magnox  has requested that the regulator approves amendments to the Dungeness A Site Emergency Plan. 

Continue reading about Amendments to Dungeness ‘A’ Site Emergency Plan

John on September 26th, 2011

A multi million pound Nitrogen Generation Plant is to be installed at the Magnox Swarf Storage Silo at Sellafield, replacing the 30 year old existing facility.

Continue reading about New Nitrogen Generation Plant at Sellafield

John on August 4th, 2011

Bradwell’s skyline is set to dramatically change with the systematic demolition of the main turbine hall at Bradwell Power Station – the site’s largest single building.

Continue reading about Bringing the House Down at Bradwell

John on July 4th, 2011

A joint venture of AMEC, Jacobs Engineering Group Inc and Costain, is one of six organisations awarded a framework contract by Magnox Limited to provide waste retrieval, processing and filling services at eight of their nuclear power station sites across the UK.

Continue reading about AMEC JV Wins UK Magnox ILW Contract